Plain-English answers to the most common questions we hear from homeowners, contractors and business owners before they start a project.

Permit drawings

What drawings does your project need?

Most people are surprised by how many sheets go into a permit set. Here is what each one is, what it shows, and when you actually need it.

Architectural drawings

Every permit set starts with architectural drawings. These show the layout, dimensions and finishes of the project. A complete architectural set includes:

  • Existing conditions plan — a measured floor plan of what is there now, before any work starts
  • Demolition plan — shows exactly what will be removed
  • New floor plans — the proposed layout at every floor level affected by the project
  • Elevations — exterior views from each side of the building, required whenever the outside changes
  • Building sections — vertical cuts through the building that show ceiling heights, stair runs and floor-to-floor dimensions
  • Details and schedules — door and window tables, wall types, insulation values and code notes

Structural engineering drawings

Any time you open up walls, add floors, remove columns, build an addition or put weight on an existing structure, the building department will ask for a structural drawing set. This includes a foundation plan, framing plans and connection details. A licensed structural engineer must stamp these sheets in DC, Maryland, Virginia and Florida.

Civil engineering and grading plans

If your project disturbs the ground — a new addition, a new driveway, a detached garage or an ADU — most jurisdictions will ask for a grading plan showing how stormwater drains off the property. Some counties also require an erosion-and-sediment-control plan during construction.

MEP plans

Mechanical, electrical and plumbing plans are required for projects that involve new HVAC equipment, electrical panels, plumbing rough-in, or significant changes to any of those systems. A basement conversion or ADU almost always requires a full MEP set.

Which sheets does your project need?

  • Deck or porch — architectural + structural
  • Basement finish — architectural + MEP (structural if walls are removed)
  • Home addition — architectural + structural + civil/grading + MEP
  • New home — full set: architectural + structural + civil + MEP
  • ADU — architectural + structural + MEP (and sometimes civil)
  • Barbershop / salon / retail — architectural + MEP
  • Restaurant — architectural + MEP + sometimes structural

Not sure what your project needs? Request a free consultation and we will tell you exactly which sheets the building department will ask for.

Architectural drawings

Who needs architectural drawings?

Not every project requires a full architectural set. But more projects than you might think do — and submitting without the right drawings leads to rejection at the building department.

Homeowners

If you are building an addition, converting a garage, finishing a basement as a rental unit, adding a second storey, building a new home, or making any change that alters the exterior of your house, you need architectural drawings. Simple interior renovations — paint, carpet, kitchen cabinets without wall removal — typically do not need a permit at all.

Contractors

If you are pulling a permit for a client's home addition, rowhouse renovation, deck or ADU, you need a signed and stamped set of architectural drawings from a designer or engineer to submit with the permit application. Most building departments will not accept a contractor's own sketches.

Business owners

Opening a barbershop, hair salon, nail salon, restaurant, retail store or any other commercial space in a leased or purchased unit almost always requires a permit. The permit application requires architectural drawings showing the proposed layout, accessible restroom locations, exit paths and any changes to walls or ceilings. The drawings must also show that the design meets the local building code for that occupancy type.

Developers and investors

Any new construction — single-family homes, townhouses, small multifamily buildings — requires a complete architectural set. Mixed-use or commercial projects require architectural drawings plus MEP and structural. Architectural drawings are also required for change-of-use permits when a building is converting from one occupancy type to another.

The short answer

If your project requires a building permit, it almost certainly requires architectural drawings. If you are not sure, ask us — we will tell you exactly what your jurisdiction requires for your specific project type.

Permit drawings

What is a permit drawing?

A permit drawing is not a design sketch or a sales rendering. It is a precise, code-compliant technical document that the building department uses to verify your project meets local building, zoning and safety requirements.

What makes a drawing "permit ready"?

A permit-ready drawing set must meet specific requirements before the building department will accept it for review:

  • Scale and dimensions — all drawings must be drawn to a recognized scale and fully dimensioned
  • Code references — notes on the drawings must cite the specific code sections the design complies with
  • Engineer or architect stamp — in most jurisdictions, at least the structural sheets — and often the full set — must bear a licensed professional's seal and signature
  • Correct sheet types — floor plans, elevations, sections, details, schedules and a site plan, in the format the jurisdiction requires
  • Zoning compliance — setbacks, lot coverage, height limits and use must all be documented

How is a permit drawing different from a design sketch?

A design sketch shows what something will look like. A permit drawing shows how it will be built — with dimensions, materials, structural connections and code compliance notes. Permit drawings go to the building department. Design sketches go to the client for approval. Most projects need both, in that order.

Who prepares permit drawings?

Permit drawings must be prepared by a qualified designer, architect or engineer. In DC, Maryland, Virginia and Florida, the structural sheets must be stamped by a licensed professional engineer. NEXTA Studio prepares the full drawing set — architectural, structural, civil and MEP — and stamps every set before submission. You do not need to coordinate multiple firms.

Start your permit drawing project →

New construction

New modern home construction drawings

Building a new home — whether a modern single-family house, a townhouse or a custom infill — requires a complete drawing set that covers everything from the site to the roof. Here is what goes into it.

Site and civil drawings

Before anything is designed, the site must be documented. Civil drawings for new construction include:

  • Survey and site plan — property boundaries, topography, existing trees and utilities
  • Grading and drainage plan — how the site will be graded so stormwater runs off the property correctly
  • Erosion and sediment control plan — required in most jurisdictions during construction
  • Utility connections — where water, sewer, gas and electric connect to the new home

Architectural drawings

The architectural set is the core of the permit package. For a new home it includes:

  • Floor plans for every level, fully dimensioned
  • Four exterior elevations showing materials, window sizes and roof pitches
  • Building sections showing ceiling heights, floor assemblies and stair geometry
  • Door and window schedules with energy code compliance
  • Wall type details, insulation R-values and air barrier notes
  • Foundation plan showing footing sizes, basement or crawl space conditions

Structural engineering drawings

Every new home requires a structural set stamped by a licensed structural engineer. This covers foundation design, floor and roof framing, beam and column sizing, lateral bracing and connection details. For modern homes with open floor plans and large spans, the structural design is critical — getting it right the first time saves significant cost during construction.

MEP plans

A new home requires complete mechanical, electrical and plumbing drawings showing HVAC ductwork layout, electrical panel schedules, lighting plans, plumbing rough-in and fixture locations. In most jurisdictions these are reviewed by separate trades inspectors in addition to the general building inspector.

Modern design considerations

Modern homes — flat or low-slope roofs, large glazing areas, open plans with minimal interior walls, cantilevered sections — introduce structural and energy code challenges that must be resolved on the drawings before the permit is issued. NEXTA Studio designs and engineers modern homes regularly, and we know how to detail these conditions so they pass plan review.

Start a new construction project →

MEP plans

MEP plans: who needs them and why

MEP stands for mechanical, electrical and plumbing. These are three separate sets of drawings that show how a building's systems are laid out and connected. Many permits cannot be issued without them.

What each plan covers

Mechanical (HVAC)

Shows the heating and cooling system: equipment location and size, ductwork layout and sizing, fresh air supply, exhaust fans and ventilation rates. Required any time you add or significantly change the HVAC system — including when the new space requires additional conditioning.

Electrical

Shows the electrical panel schedule, circuit layout, lighting plan, outlet and switch locations, and special systems like exhaust fans, commercial kitchen hoods or EV chargers. Required for any work involving the electrical system beyond simple outlet replacements.

Plumbing

Shows water supply and drain-waste-vent routing, fixture locations, water heater, cleanout locations and backflow prevention. Required any time you add a bathroom, kitchen, laundry room or commercial sink.

When you need all three

A basement ADU, a commercial build-out, a restaurant, a hair or nail salon, or any new construction almost always requires all three MEP sets. A simple deck addition typically does not need MEP plans at all.

Who requires MEP plans?

  • Washington DC — required for commercial projects and residential projects adding kitchens, bathrooms or HVAC
  • Maryland — required for most permits involving systems changes; Montgomery and Prince George's County both require MEP coordination
  • Virginia — Fairfax, Arlington and Alexandria require MEP for commercial fit-outs and residential ADUs
  • Florida — required on most commercial and residential permits involving systems work

Do MEP plans need to be stamped?

In most commercial projects, yes — the mechanical and plumbing sheets must be stamped by a licensed engineer. NEXTA Studio provides stamped MEP plans as part of our full-service permit drawing packages.

Get MEP plans for your project →

Decks & porches

How to get a deck permit in DC, Maryland and Virginia

A deck looks simple, but the building department will want a proper set of drawings before they issue a permit. Here is what you need and what to expect.

Do you need a permit for a deck?

In almost every jurisdiction in DC, Maryland and Virginia, yes. The rule of thumb: if the deck is attached to the house, more than 30 inches above grade, or more than 200 square feet, you need a building permit. Some HOA rules also require separate approvals. Check with your local building department or ask us — we know the rules in every county we serve.

What drawings does a deck permit require?

  • Site plan — shows the property lines, the house footprint and where the deck sits on the lot
  • Deck framing plan — beam and joist sizes, post locations and spans
  • Deck elevation — railing height, stair configuration and how the deck connects to the house
  • Foundation detail — post-and-footing connection, footing depth and frost protection
  • Connection details — ledger-board attachment, beam-to-post and joist-hanger details

Does a deck need an engineer stamp?

In Washington DC, an engineer stamp is required for all deck permit drawings. Maryland and Virginia counties vary — many require a stamp for decks over a certain size or height. Fairfax County and Montgomery County both commonly require stamped drawings. We prepare stamped deck drawings as standard, so you will not need to find a separate engineer.

Start a deck permit project →

Accessory dwelling units

ADU permit drawings: what you need in DC, Maryland and Virginia

Accessory dwelling units — basement apartments, garage conversions and backyard cottages — each come with different drawing requirements depending on their type and location.

Types of ADUs and what they need

Basement ADU

Requires drawings showing the proposed layout, egress windows or doors, ceiling height compliance, bathroom rough-in and a full MEP set for the new kitchen and bathroom. Structural drawings are needed if walls are removed or a separate entrance is cut through the foundation wall.

Garage conversion

Requires architectural drawings showing the new layout, energy code compliance (insulation, windows), and MEP plans. If the garage slab is on grade, you may also need grading or drainage documentation.

Detached backyard ADU

A new detached ADU is essentially a small new building. It requires a full drawing set: architectural, structural, civil/grading and MEP, all stamped by a licensed engineer.

Interior conversion (above garage, attic)

Requires drawings showing ceiling height, egress, fire separation and stair access. Structural drawings confirm the existing framing can carry the new live load.

ADU zoning considerations

Not every property is zoned to allow an ADU. In Washington DC, ADUs are allowed in most residential zones as long as the lot meets minimum size requirements. In Maryland, rules vary by county. Northern Virginia counties allow ADUs in most single-family zones. Before drawing anything, we check your zoning to confirm what is allowed.

Start an ADU project →

Commercial build-outs

Barbershop permit drawings: what you need to open

Opening a barbershop involves more than signing a lease and buying chairs. You will need a building permit, a business license, and in most states, an inspection by the cosmetology board. Permit drawings are required before any of those can happen.

What permits does a barbershop need?

  • Building permit (fit-out) — required any time you make changes to walls, plumbing, electrical or ceilings inside the leased space
  • Plumbing permit — required for shampoo bowls and sink additions; covered in your MEP plans
  • Electrical permit — required for new circuits, outlets and lighting; covered in your MEP plans
  • Certificate of occupancy — issued after inspections pass; required before you can open
  • Cosmetology board inspection — separate from building permits; the board checks that your shampoo stations, mirrors, ventilation and sanitation stations meet state licensing standards

What drawings does a barbershop permit require?

A typical barbershop permit drawing set includes:

  • Existing and proposed floor plans showing the barber station layout, shampoo areas, waiting area and restrooms
  • Reflected ceiling plan showing lighting and any soffits or dropped ceilings
  • Accessible restroom detail (ADA compliance is required in commercial spaces)
  • Plumbing plan showing shampoo bowl locations, sink rough-in, floor drains and water heater
  • Electrical plan showing circuits, outlets, lighting fixtures and panel schedule
  • Ventilation plan — required if the space has no existing adequate HVAC for the new occupant load

Do barbershop drawings need an engineer stamp?

In DC, Maryland, Virginia and Florida, commercial fit-out drawings — including barbershops — must be stamped by a licensed engineer. The building department will not accept unstamped drawings for commercial permits.

What about the cosmetology board layout requirements?

Each state has its own cosmetology board regulations for minimum station spacing, shampoo bowl requirements, mirror sizes and sanitation station placement. We are familiar with DC, Maryland, Virginia and Florida board requirements and incorporate them into the drawings so your layout passes both the building department and the board inspection.

Start a barbershop permit project →

Commercial build-outs

Nail salon permit drawings: what you need to open

Nail salons are one of the most regulated commercial spaces in the beauty industry. The chemicals used in nail services require specific ventilation systems that must be documented on permit drawings — and inspectors check them carefully.

Why nail salons face stricter requirements

Nail products — acrylics, gels, polishes and removers — release volatile organic compounds (VOCs) that must be exhausted from the workspace. Building codes and OSHA regulations require nail salons to have dedicated exhaust ventilation at each table, not just general HVAC. These requirements must be shown on the mechanical drawings and verified during inspection.

What drawings does a nail salon permit require?

  • Floor plan showing nail table layout, pedicure chair locations, reception area, dispensary and restrooms
  • Reflected ceiling plan with lighting and exhaust fan locations
  • Mechanical/ventilation plan showing individual table exhaust ducts, makeup air supply, exhaust fan specs and CFM calculations
  • Plumbing plan for pedicure chair drain lines, utility sink and restroom rough-in
  • Electrical plan for circuits, outlets (pedicure chairs often need dedicated circuits) and panel schedule
  • ADA-accessible restroom detail

Pedicure chair ventilation and plumbing

Pedicure chairs require both a dedicated drain connection and, depending on the model, an exhaust connection at the base. The plumbing plan must show each chair's drain routing to the building's sanitary system. If the chairs use whirlpool jets, additional disinfection documentation may be required.

State cosmetology board requirements

In DC, Maryland, Virginia and Florida, nail technicians are licensed by the state cosmetology board, which has its own inspection of the space. Board requirements cover minimum square footage per technician, ventilation standards, sanitation stations, dispensary requirements and restroom accessibility. We incorporate all board requirements into the drawings so you pass both inspections.

Start a nail salon permit project →

Commercial build-outs

Hair salon permit drawings: what you need to open

A hair salon build-out — whether you are fitting out a raw space, taking over from a previous tenant, or remodeling an existing salon — requires a building permit with architectural and MEP drawings before any licensed contractor can begin work.

What permits does a hair salon need?

  • Building permit — for any changes to walls, ceilings, plumbing or electrical inside the space
  • Plumbing permit — shampoo bowls require new drain and supply lines
  • Electrical permit — styling stations, dryers and color processing areas often need dedicated circuits
  • Certificate of occupancy — required before you can open
  • State cosmetology board inspection — separate from the building permit process

What drawings does a hair salon permit require?

  • Floor plan showing styling stations, shampoo area, color bar, dryer area, reception and restrooms
  • Reflected ceiling plan with lighting layout and any soffits or mirrors
  • Plumbing plan for shampoo bowl drain and supply connections, utility sink and restroom rough-in
  • Electrical plan showing outlets, circuits, lighting and panel schedule; color processing stations often need 20-amp dedicated circuits
  • Mechanical plan if HVAC is being added or modified
  • ADA restroom detail — required for all commercial spaces open to the public

Shampoo bowl and color bar requirements

Shampoo bowls must be connected to the building's sanitary drain system with proper trap and venting. Color mixing areas require a utility sink with chemical-resistant plumbing fixtures. The plumbing plan must show all of these connections clearly so the plumbing inspector can follow the rough-in.

Taking over an existing salon space

If the previous tenant was also a hair salon, some of the existing plumbing and electrical may still be in place. However, you will still need permit drawings showing the as-built conditions and your proposed layout. In many jurisdictions, a change of tenant in a commercial space triggers a new certificate of occupancy even if the use is identical.

Start a hair salon permit project →

3D design

3D design: see your project before it is built

A floor plan tells you where things are. A 3D model shows you what it feels like to be there. For most clients, a 3D model is the moment the project becomes real — and the moment they catch design decisions they want to change before construction starts.

What is a 3D architectural model?

A 3D architectural model is a digital three-dimensional representation of your project. It can show the building's exterior, interior spaces, materials, colors, lighting and surroundings. From the model, we generate:

  • Exterior renderings — photorealistic images of the outside of the building from any angle
  • Interior renderings — views from inside the space showing materials, finishes, lighting and furniture
  • Bird's-eye views — aerial perspective showing how the building sits on the site
  • Section perspectives — cutaway views showing the interior layout in three dimensions

Why get a 3D model?

Clients who see their project in 3D before construction catch issues that are invisible on a flat floor plan — a window that blocks a kitchen view, a ceiling that feels lower than expected, a stair that takes up more space than anticipated. Catching and fixing those things in the model costs nothing. Fixing them during construction can cost thousands.

Who benefits most from 3D design?

  • Homeowners designing an addition, renovation or new home who want to see the finished result before committing to a design
  • Business owners fitting out a salon, restaurant or retail space who want to present the concept to investors or landlords
  • Developers who need marketing images before a project is built
  • Contractors who want to walk clients through a project before breaking ground

Does NEXTA Studio include 3D in permit drawings?

Our permit drawing package focuses on the technical documents the building department requires. 3D design is an optional add-on. We use the same model for both — the 3D model we build for the rendering is the same one we dimension and annotate for the permit set, so there is no duplication of work.

Add 3D design to your project →

3D animation

3D design animation and walkthrough videos

A still rendering shows one moment in one space. An architectural animation — a rendered video that moves through the building — shows the experience of the whole project: how spaces connect, how light changes, how the exterior meets the street.

What is an architectural animation?

An architectural animation is a pre-rendered video built from the same 3D model used for still renderings. The camera moves through or around the building on a planned path, showing spaces in sequence. The result looks like a video walkthrough of a finished building that has not been built yet.

Types of architectural animation

  • Exterior flyover — the camera orbits or approaches the building from the outside, showing all elevations and how it sits on the site
  • Interior walkthrough — the camera moves through the floor plan from entry to each room, showing ceiling heights, openings and material changes
  • Blueprint-to-reality animation — starts with a plan or technical drawing that "builds" into the finished 3D model in real time, a compelling format for presentations and marketing
  • Daylight study — shows how sunlight moves through the building at different times of day or year, useful for passive solar design review

When is an animation worth it?

Architectural animations are most valuable when you need to communicate a complex project to someone who cannot read drawings — investors, lenders, planning boards, HOAs, or prospective buyers. A two-minute animation of a new home or commercial project communicates what would take hours to explain from drawings alone.

How long does an animation take to produce?

Animation production comes after the 3D model is finalized. The camera path, lighting and rendering settings must be planned, then each frame rendered. A short architectural animation (30 to 90 seconds) typically requires the design to be complete and approved first.

Request a 3D animation quote →

Building department process

What to do when the building department sends review comments

Getting review comments back from the building department does not mean your project is in trouble. It is a normal part of the permit process — here is exactly what happens and what you need to do.

What are review comments?

After you submit a permit application, a plan reviewer checks your drawings against local code and zoning requirements. If they find anything that needs clarification or correction, they send a list of comments — sometimes called a deficiency list, correction notice or plan review letter — back to the applicant.

Review comments are extremely common. Most first-time submissions receive at least a few. Getting comments does not mean the design is wrong — reviewers often ask for additional notes, clarifying dimensions or code references that need to appear on the drawings.

What do review comments typically ask for?

  • Missing code notes (fire rating, egress, energy code details)
  • Dimensions that need to be added or clarified
  • Additional details showing how a connection is made
  • Confirmation that a design meets a specific code section
  • A written response explaining a design decision
  • Updated structural calculations or drawings

What NEXTA Studio does when comments come in

When the building department sends review comments on drawings we prepared, we handle the revision at no extra charge:

  • We read and interpret every comment
  • We revise the drawings to address each item
  • We write a comment-response letter if the reviewer asks for one
  • We prepare a revised drawing set for resubmission

We go through as many revision rounds as it takes until the permit is approved. There is no additional fee for this — it is included in the original scope of work.

Request a consultation →

Licensed engineer

Do you need a licensed engineer to stamp your drawings?

Many homeowners assume any drafter or designer can prepare permit drawings. In most jurisdictions we serve, that is not true — and submitting unstamped drawings leads to rejection at the building department.

When is an engineer or architect stamp required?

  • Washington DC — requires a licensed engineer or registered architect stamp on all permit drawings for construction affecting the structure
  • Maryland — structural drawings must be prepared by a licensed engineer; most counties require a stamp on structural sheets even for single-family homes
  • Virginia — engineering stamps required for structural work; individual localities vary on architectural sheets
  • Florida — one of the stricter states; most counties require a licensed engineer or architect stamp on all permit drawings, including relatively simple residential projects

What happens if you submit without a stamp?

The building department will reject the drawings at intake or send review comments requiring a sealed set before continuing their review. This adds significant time to your project — and if a contractor has already started work, it can create serious problems with inspections later.

Is NEXTA Studio's engineer licensed in all your states?

Yes. Our licensed engineer holds professional engineering licenses in Washington DC, Maryland, Virginia and Florida. Every permit drawing set we prepare is reviewed and sealed by our engineer before it goes to the building department. You do not need to find a separate engineer.